Connecticut's ADU Rules Changed on October 1. Here's What Your Town Can and Can't Ask For.
If you have been thinking about an in-law suite over the garage, or a small cottage out back, the rules moved in your favor on October 1.
Public Act 26-7 took effect that day. It rewrites the part of Connecticut law that tells towns how they may zone accessory dwelling units — ADUs. The headline change is a rename: the statutes now say "accessory dwelling unit" where they used to say "accessory apartment." The useful part is further down, in the list of things a town is no longer allowed to require.
What a town cannot ask of you
The law sets a floor that local zoning regulations have to meet. Under it, a town may not require:
- a passageway connecting the ADU to the main house
- an exterior door for the ADU, unless the building or fire code calls for one
- more than one parking space for the unit
- that the people in the ADU be related to, married to, or employed by the people in the main house
- a minimum age for whoever lives there
- separate utility billing, when those utilities already serve the main house
- that you renew the permit every few years
Two more, and these are the ones that quietly kill projects. A town may not make you correct an unrelated nonconforming use, structure or lot as a condition of approving the ADU. If your house sits closer to the line than today's setback would allow, that is not something you have to fix first. And the town may not require sprinklers in the ADU if the main house does not have to have them and the fire code does not call for them.
Size, setbacks and where it can go
At least one ADU has to be allowed as of right on a lot that holds a single-family house, and it cannot be required to be an affordable unit. It may be attached to the house, built inside it, or detached and standing on its own in the yard.
On size, local regulations have to allow at least 30 percent of the main house's net floor area, or 1,000 square feet, whichever is smaller. A town is free to allow more. It cannot allow less.
Setbacks, lot size and frontage for the ADU have to be equal to or easier than what the main house has to meet. Lot coverage runs the other way — equal to or more permissive. And a town cannot hold the ADU to height, landscaping or architectural standards stricter than the ones it applies to single-family houses.
The part that saves real money
Utility connections are where this law bites hardest. A municipality, a special district, a sewer or water authority, or a water company may not:
- treat the ADU as a new residential use when it calculates connection fees or capacity charges — unless the ADU is being built at the same time as a brand new house on that lot
- require a new or separate utility connection running directly to the ADU, or charge a fee for one
Connection and capacity charges are not rounding errors. Being billed as an addition to an existing house instead of as a second house can change the budget for the whole project.
The catch: your town may have opted out
Check this before you get attached to a plan.
Connecticut still lets a municipality opt out of the ADU provisions. It takes a two-thirds vote of the zoning commission after a public hearing, with the reasons entered in the record and published in a local newspaper, followed by a two-thirds vote of the town's legislative body. Public Act 26-7 did not close that door. A separate bill this session would have repealed the opt-out, and it did not become law.
So "state law allows it" and "your town allows it" are two different questions. The second one is the one that decides what happens on your lot.
One more piece worth knowing: if you own property in a transit-oriented district and have owned it for at least three years, you may build an ADU there as of right, as long as it meets the structural and architectural requirements in the local zoning regulations.
What this means if you are planning one
We design ADUs across Fairfield County, and this is the first thing we check on a new project: whether your town opted out, what its current regulations say about size and placement, and where your utilities already run. That check comes before anything gets drawn, because it decides whether you are planning a detached cottage, a unit over the garage, or nothing at all.
Send us the address and what you have in mind, and we will tell you what your town allows today.